This Project was awarded to Shekar Engineering (SHEKAR) by the Iowa Department of Natural Resources (IDNR). The Project site is located inside the Storm Lake in Storm Lake, Iowa and is identified as Little Island. The Little Island was getting eroded due to high water levels in the lake. The contract included excavating along the perimeter of the Little Island and filling it.

Contract No. Project No. 14-01-11-01
Client State of Iowa Department of Natural Resources
Contract Type Fixed Price
Prime / Sub Prime
Final Contract Price $545,701.88
Contract Start Date 2/14/2017
Final Completion Date 11/23/2018
Contracting Officer (CO) Kim Alliss
Ph: 515-725-0733

Iowa Department of Natural Resources
505 E 9th Street
Des Moines, IA 50319-0034t
Email: kim.alliss@dnr.iowa.gov
Project Engineer Jeff Felts, DNR District Engineer
Mobile: 515-250-3712
Email: jeff.felts@dnr.iowa.gov

The scope of work also included:

  • Mobilization including long reach excavator, front end loaders, barges, and tug boat;
  • Building a Staging Area, which required installation of sheet piles;
  • Excavation of about 4500 CY of soils along the perimeter of the island;
  • Installing engineering fabric;
  • Placing Revetment; solid field stone armoring- 5565 tons
  • Placing 6” top soil on the island
  • Seeding and rolled erosion matting